bathroom work

roth140

Registered User
Joined
Jan 27, 2008
Messages
1,115
the pictures are large and may be up to 2mb each.


A friend and I did all of this work over the last two days.

Day one of the bathroom:

i tore up the old tile floor and pulled out the old tub. the hot and cold water lines were reversed and in the wrong position for the new tub. everything was in the wrong position for the new tub. all new water lines were ran along with the tub faucet, shower line, and drain.

http://home.comcast.net/~roth.scott/bathroom/DSCF0112.JPG
http://home.comcast.net/~roth.scott/bathroom/DSCF0113.JPG
http://home.comcast.net/~roth.scott/bathroom/DSCF0115.JPG

day two:

we got the shower surround in place and caulked. i got the new vanity in place, temporarily. the drain and water lines are connected for now and the sink top is loose. the new unit had to go in. we broke the old vanity up to get the shower surround in. i hung the mirror for now too.

http://home.comcast.net/~roth.scott/bathroom/DSCF0118.JPG
http://home.comcast.net/~roth.scott/bathroom/DSCF0119.JPG
http://home.comcast.net/~roth.scott/bathroom/DSCF0120.JPG
http://home.comcast.net/~roth.scott/bathroom/DSCF0121.JPG
http://home.comcast.net/~roth.scott/bathroom/DSCF0122.JPG
http://home.comcast.net/~roth.scott/bathroom/DSCF0123.JPG
http://home.comcast.net/~roth.scott/bathroom/DSCF0124.JPG

we still have wall patching (clearly), floor scraping, flooring, new toilet, wall texturing, priming, and painting. there is a little electrical to do for the new mirror and some patching to do on the ceiling. i have to cover the hole from the old fixture. we paln on raising the mirror another 3 inches or so. its sitting a little low.
 
Nice. We're gonna be re-doing a couple bathrooms at my new house too. It'll be interesting :D
 
Back
Top